CLEANROOM PROJECTS & EQUIPMENT
✉  ·   ·  EN · 中文 · VI · TH · MS · ES · PT · RU
HOME / PHARMA & MEDICAL GMP / COMPACT MEDICAL PACKAGING CLEANROOM EPC

ISO 13485 & EU MDR Compact Medical Packaging Cleanroom EPC

Pre-engineered 90–260 m² Hybrid ISO 8 + ISO 5 Laminar Island cleanrooms built around compact 4.2m CE thermoforming & blister lines—delivering both machinery + validated cleanroom inside a €150k–€200k CAPEX budget.

EU MDR 2017/745ISO 13485 & ISO 11607HYBRID ISO 8 + ISO 525-DAY PRE-CUT KIT

How €150k–€200k Medical Device Plants Beat Legacy €450k Buildouts

New sterile disposable, catheter, syringe, implant, and diagnostic plants across Eastern Europe, the Balkans, Turkey, and Latin America no longer spend €450,000 and wait 12 months for a 10-meter legacy thermoformer. Modern compact 4.2m CE packaging lines cut floor length by 40% and ship in 45–60 days—creating two immediate cleanroom requirements:

  • Hybrid ISO 8 + ISO 5 Laminar Island (-42% HVAC CAPEX): Suspend an HT-CB ISO 5 H14 laminar canopy (0.45 m/s) directly over the 2.0m open loading zone while operating the 95–120 m² hall at ISO 8 (+30 Pa).
  • Zero-Cardboard 50kg Film-Roll Airlock (HT-HQ36R): Floor-level SUS304 roller air-shower pass box transfers heavy de-boxed Tyvek® 1073B & rigid PETG/PVC reels without back injury or carton fiber contamination.
  • Isolated Vacuum-Pump Technical Chase: Pre-cut wall penetrations route thermoformer vacuum exhaust and trim blowers outside the clean envelope.
  • 25-Day Fabrication + 20-Day Bolt-Up: Matches 45–60 day compact packaging machine delivery so EU Notified Body OQ/PQ validation starts on day one.
Get Free 48h Packaging Suite CAD Layout → 🧮 €150k–€200k CAPEX Calculator
HENGTAI CLEAN Hybrid ISO 8 Hall with Localized HT-CB ISO 5 Laminar Canopy Over Medical Packaging Line
ARCHITECTURAL PRESSURE CASCADE & UTILITY CHASE SCHEMATIC (EU MDR / ISO 11607 COMPACT PACKAGING SUITE)
1. Grey De-Boxing (0 Pa) Strip outer cartons off 50kg Tyvek / PETG reels HT-HQ36R 2. PAL Gowning (+15 Pa) R20 Scrub + HT-GC-9050 + SUS304 Air Shower 3. Primary Packaging Hall · ISO Class 8 (+30 Pa · 95–120 m²) 50mm Halide-Free MgSO4 / Rockwool Flush Panels + R50 Coving + 1.5m Rigging Door HT-CB ISO Class 5 Vertical Laminar Island (0.45 m/s H14) Compact 4.2m CE Thermoforming / Blister Line Forming → Open Sterile Loading (ISO 5 Protected) → Heat Seal & Die-Cut 4. Isolated Technical Chase (0 Pa): Vacuum Pump Exhaust, Trim Blower & Chilled/Compressed Air 5. Cartoning & Out (+10 Pa) Sealed Sterile Pouches exit via Interlocked Pass Box ✓ Zero Cardboard in ISO 8 ✓ -42% HVAC Cooling kW ✓ 20-Day Bolt-Up Assembly ✓ Full EN 1822 IQ/OQ Pack

Interactive €150k–€200k Medical Suite CAPEX & HVAC Load Calculator

3 Pre-Engineered EU MDR / ISO 13485 Medical Packaging EPC Packages

Package CodeFootprint & Line FitIncluded HT-* Cleanroom & HVAC SubsystemsFOB Reference & Lead Time
HT-MED-9595 m² (Fits 1× Compact 4.2m Thermoformer/Blister Line)ISO 8 MgSO4 Envelope + 1× HT-CB ISO 5 Island + 1× HT-HQ36R Roller Pass Box + PAL Air Shower + HT-PAC-2000 Clean AC$38,500–$46,000 FOB · 25 Days
HT-MED-160160 m² (Fits 2× Compact Packaging Lines + De-Boxing)ISO 8/7 Envelope + 2× HT-CB ISO 5 Islands + 2× HT-HQ36R + HT-GC-9050 Wardrobe + Hygienic DX AHU + 1.5m Rigging Doors$62,000–$76,000 FOB · 28 Days
HT-MED-260260 m² (Clean Injection/Assembly + 2–3 Packaging Lines)Full ISO 7/8 Suite + BMS Pressure Cascade + HT-2PY2 Sliding Cargo Air Shower + HT1-SLD 250°C Tunnel HEPA + Full IQ/OQ$98,000–$124,000 FOB · 35 Days
Direct China Manufacturer · Grade-II EPC License D244805460 · ISO 9001 & CE

Request a 24-Hour Turnkey Cleanroom & Equipment BOQ

Looking for factory-direct pricing without middleman markups? Send our cleanroom HVAC and stainless equipment engineers your layout, target ISO 14644-1 class, or equipment list.

  • Stage-1 Budgetary Quote in 4–24 Hours: Itemized EXW / FOB Guangzhou / CIF / DDP unit pricing & container load plan.
  • Free Engineering Value-Add: AutoCAD room pressure cascade review, CFM/ACH air-change calculation & utility matrix.
  • Download Technical Dossiers: 6 A4 Engineering Spec Sheets (PDF) →
Direct Engineering Desk (Alex Gao):
Email: · WhatsApp:

Get Factory-Direct Pricing & CAD Support

No obligation · Direct response from senior cleanroom project engineer Alex Gao

By submitting you agree to our privacy policy; we use your details only to reply to this inquiry.