Turnkey Cleanroom Design & Construction

ISO 7 / ISO 8 / GMP clean workshops for food, pharmaceutical, cosmetics and electronics factories — design, materials, equipment and installation supervision from one contract.

Define the Project Scope

A cleanroom project combines design, material supply, equipment, installation and testing. Define the contracted scope, local responsibilities and acceptance criteria before comparing quotations:

  • Design: layout, airflow, pressure cascade and personnel/material flow engineered to ISO 14644 & GMP; 3D drawings and equipment schedule by agreement
  • Materials: cleanroom sandwich panels, cleanroom doors and windows, epoxy flooring accessories — supplied direct
  • Equipment: air showers, pass boxes, FFU/HEPA terminals, AHU purification units, ozone systems — made in our own factory
  • Installation: our supervisors lead your local crew, or full EPC team for larger projects
  • Validation: agree the required tests, acceptance criteria, qualified test provider and responsibility for reports before contracting
Send Floor Plan — Free Proposal
Cleanroom construction project corridor with observation windows

From bare shell to Class 100K — drag to compare

Cleanroom after handover
Factory shell before cleanroom fit-out
BEFORE · BARE SHELLAFTER · CLASS 100K

ILLUSTRATIVE PROJECT VISUAL · SCHEDULE DEPENDS ON THE AGREED SCOPE AND SITE CONDITIONS

Cleanliness Classes We Build

Class (US FED 209E)ISO 14644Typical UseTypical Zones
Class 100ISO 5Sterile filling, laboratory laminar zonesFFU ceiling work zones, laminar hoods
Class 10,000ISO 7Pharmaceutical preparation, cosmetics filling, medical devicesCore production rooms
Class 100,000ISO 8Food processing, beverage, packaging materials, electronics assemblyProduction halls, inner packing rooms
Class 300,000General production zones, warehouses, pre-processingSupport areas

Full production-environment planning per food GMP / HACCP: general production zone → quasi-clean zone → clean production zone, with personnel purification (air shower, hand-wash & disinfection, changing rooms) and material purification (pass box, cargo shower) at every boundary.

Three Delivery Models

A. Design + Material Package

We engineer the cleanroom and ship a complete kit — panels, doors, FFUs, AHU, air showers, pass boxes — with installation drawings and video guidance. Your team or local contractor installs. Best for remote markets and experienced buyers.

B. Supervised Installation

Request a project-specific supervision scope. Confirm the destination, staffing, site access, local contractor responsibilities and commissioning arrangements before including supervision in the contract.

C. Full Turnkey EPC

Discuss an integrated engineering, procurement and construction scope for your site. Availability, local licensing, installation resources, price, schedule and responsibility boundaries require project-specific confirmation.

Project Gallery

Food clean workshop with epoxy flooring
Cleanroom with steel doors and vision panels
Food production line inside ISO 8 cleanroom
FFU ceiling cleanroom under commissioning

Get a budget on an agreed schedule

Send four things: floor plan (or room size), industry, target class, country — we return layout + equipment list + budget.

Start My Project

Frequently Asked Questions

How much does a cleanroom cost per square meter?

Illustrative planning assumptions, not a quotation or verified project dataset: Class 300,000 runs USD 80–140/m², Class 100,000 runs USD 120–220/m², and Class 10,000 runs USD 200–350/m² — covering envelope, HVAC and core equipment, excluding local civil works.

How long does cleanroom construction take?

Construction timing depends on approved design, equipment configuration, freight, site readiness, local installation resources and agreed testing. Request a project-specific schedule with separate approval, delivery, installation and acceptance milestones.

Can BESTCLEAN build cleanrooms outside China?

Yes, three ways: a material package with video guidance; BESTCLEAN supervisors leading your local crew in Vietnam, Thailand, Indonesia, Malaysia or the Philippines; or full turnkey EPC delivery.

Before requesting a quotation

Cleanroom RFQ Checklist: Compare Scope Before Price — prepare comparable requirements and acceptance questions.

Check the evidence behind your quotation

For a cleanroom project, confirm the contracting parties, local installation responsibilities, test scope and handover documents before comparing prices.

Use this 20-item worksheet for cleanroom projects and equipment. It is a buyer review aid, not a certificate or confirmation that a particular document is available.

Download the evidence checklist (CSV)

Review original factory documentation · Request documents for your quotation

💬 WhatsApp