Vapor-tight modular dry cleanrooms and dual-stage silica-gel / molecular-sieve desiccant rotor dehumidification skids for electrolyte filling, cell stacking & solid-state electrodes.
Guangzhou Hengtai (HENGTAI CLEAN · EPC License D244805460) engineers and manufactures turnkey ultra-low dew point dry cleanrooms (-40°C to -65°C dew point at 21°C room temperature, equivalent to 127 ppmv down to 5.4 ppmv moisture / < 0.05% RH) for EV pouch/prismatic cell assembly, LiPF6 electrolyte injection (preventing hydrofluoric acid HF formation), lithium-metal anode lamination, and sulfide solid-state battery pilot/gigafactory lines (preventing toxic H2S gas generation). We manufacture both the vapor-tight double-sealed modular envelope AND the dual-rotor desiccant dehumidifier AHU skid in-house.

W_total (g/h) = N_operators × w_human (130–180 g/h) + Q_infiltration × Δd + W_door_openings + W_material · At -50°C dew point (0.038 g/kg dry air), just one human technician exhaling/perspiring 150 g/h equals the moisture content of 3,950 kg/h of ultra-dry supply air! Our engineering team sizes dual-rotor reactivation heat recovery and dry-air purge airlocks strictly around your exact operator headcount and conveyor slot openings.
| Dry Room Tier / Model | Target Dew Point & Moisture | Process Application | Dehumidification Architecture | Vapor-Tight Envelope Spec | Engineering BOQ Basis |
|---|---|---|---|---|---|
| HT-DRY-30 (-30°C to -35°C DP) | -30°C to -35°C DP (220–380 ppmv · < 1.5% RH) | Cathode/Anode Slitting, Calendaring & Winding | Pre-Cool Chilled Coil + Single Silica-Gel Rotor | 75mm PIR / Hydrophobic Rockwool + Butyl Joint Tape | Custom BOM Quote (24h Itemized BOQ) |
| HT-DRY-45 (-40°C to -45°C DP) | -40°C to -45°C DP (70–127 ppmv · < 0.5% RH) | EV Cell Stacking, Baking Unload & LiPF6 Electrolyte Filling | Dual-Stage Silica-Gel + Molecular-Sieve Composite Rotor | 75/100mm Double-Skin Steel + Internal Foil + Dual RTV Bead | Custom BOM Quote (24h Itemized BOQ) |
| HT-DRY-60 (-55°C to -65°C DP) | -55°C to -65°C DP (5.4–21 ppmv · < 0.08% RH) | Lithium-Metal Anode & Sulfide Solid-State Battery Lines | Twin-Rotor Cascade + Dry-Air Purge Chamber + Local Dry Tunnel | SUS304 Continuous-Seam / Hermetic Welded Vapor Barrier + +25 Pa | Custom BOM Quote (24h Itemized BOQ) |
| HT-DRY-LAB (20–80 m² R&D Dry Suite) | -45°C to -60°C DP · ISO Class 6/7 | University & OEM Battery Pilot Line / Glovebox Replacement | Skid-Mounted Plug-and-Play Electric/Steam Reactivation Unit | Pre-Cut 1×40'HQ Modular Vapor-Tight Room + Dry Air Shower | Custom BOM Quote (24h Itemized BOQ) |
Desiccant regeneration (120°C–140°C) accounts for 70% of dry-room OPEX. We recover chiller condenser waste heat and exhaust reactivation air through plate heat exchangers to pre-heat regeneration intake air, cutting steam/electric kW by up to 38%.
Ordinary cleanroom silicone allows water-vapor diffusion under a 15,000 ppmv vapor-pressure differential. We apply polyisobutylene (PIB) butyl gaskets inside panel tongues, continuous 0.7mm steel skins, low-permeance RTV sealants, and +25 Pa dry-air shower airlocks.
Hybrid design maintains the macro operator room at -35°C DP while enclosing the open cell-stacking/filling track inside an ISO 5 -60°C DP polycarbonate/SUS304 mini-tunnel—slashing capital and power cost by 40%.
91440101MA59M8NW4E · Building EPC Grade-II D244805460 · Decoration/Steel/Environmental Grade-II D344227631 · Safety License GD-JZ [2022]010947.GR202444009466 · ISO 9001:2015 90924Q00571R0M · CE & EAC · 63 National Patents & 19 Software Copyrights.
Sulfide solid electrolytes (such as argyrodite Li6PS5Cl) react rapidly with trace atmospheric moisture above -45°C dew point, degrading ionic conductivity and releasing toxic hydrogen sulfide (H2S) gas. Maintaining -55°C to -65°C DP with continuous H2S gas monitoring ensures both operator safety and cell yield.
Standard pre-cooling and inter-stage cooling coils operate on 5°C/10°C or 7°C/12°C chilled water (or low-temp glycol at -2°C/+3°C for tropical high-humidity intakes in Thailand, Vietnam, and Indonesia).
Once vapor-barrier sealing passes pressure-hold verification (+50 Pa), our HT-DRY-LAB skid pulls an unoccupied 100 m² room from 55% RH down to -45°C dew point within 4 to 6 hours.
Looking for factory-direct pricing without middleman markups? Send our cleanroom HVAC and stainless equipment engineers your layout, target ISO 14644-1 class, or equipment list.
Prevent LiPF6 electrolyte hydrolysis and sulfide solid-state moisture degradation with dual-stage silica/molecular-sieve desiccant rotor AHUs and vapor-tight laser-welded/double-gasketed cleanroom envelopes.
| Cleanroom Class / Subsystem | Target Standard / Capacity | HENGTAI Factory Specification | Primary Application |
|---|---|---|---|
| Electrolyte Filling Dry Room | -45C to -55C Dew Point (<0.5% RH) | Dual-Stage Proflute Rotor + Heat Recovery | Cylindrical / Pouch Cell Line |
| Solid-State Sulfide Dry Suite | -60C to -65C Dew Point (<10 ppm H2O) | Vapor-Barrier Aluminum Honeycomb Envelope | Zero H2S Off-Gassing Safety |
| Effervescent / Probiotic Suite | 15% - 25% RH @ 20-22C | Single-Stage Desiccant + Chilled Water DX | Oral Dissolving Film & Softgel |
A (HENGTAI Chief Engineer): Waste condenser heat pre-warms reactivation air before steam/electric trim heaters, while low-leakage airlocks cap infiltration, cutting regeneration kW by 32%.