Everything between the factory gate and the clean zone: boot washing, hand washing & disinfection, changing-room furniture and food-grade doors — all SUS304 stainless steel.







| Model | Power | Size L×W×H (mm) | Brush Speed | Water Use | Weight |
|---|---|---|---|---|---|
| BJ-I | 0.75 kW / 380V | 1180×920×1310 | 56 rpm | 5 L/min | 150 kg |
| BJ-II | 1.1 kW / 380V | 1770×950×1300 | 56 rpm | 9 L/min | 130 kg |
| BJ-III (walk-through) | 1.1 kW / 380V | 1640×1240×1330 | 56 rpm | 9 L/min | 200 kg |
| Stations | Size L×W×H (mm) | Operation |
|---|---|---|
| 1 station | 600×600×800 | Infrared sensor or knee-push; 15–90s timed flow; silent basin; optional soap dispenser & dryer |
| 2 stations | 1200×600×800 | |
| 3 stations | 1800×600×800 | |
| 4 stations | 2400×600×800 |
Send staff count per shift — we lay out the full hygiene line (lockers → sinks → boot wash → air shower) with budget.
Ask each supplier to answer the same requirements and identify the evidence for its proposed configuration. An unanswered field is an open question, not proof that a supplier cannot meet the requirement. Availability and acceptance criteria must be confirmed for your order.
| Comparison field | What to request |
|---|---|
| People and traffic | Peak entry flow, exit route and available installation space |
| Required actions | Agreed hand, sole and boot cleaning steps for the process |
| Layout and access | Footprint, approach, bypass control and emergency access requirements |
| Utilities | Water, drainage and electrical requirements for the selected configuration |
| Materials and cleaning | Material, finish and compatibility with intended cleaning agents |
| Operation | Consumables, settings, training and site responsibilities |
| Maintenance | Brush, dispenser and other replacement parts; cleaning and access needs |
| Acceptance | Approved configuration and agreed functional checks; device presence alone is not food-safety certification |
Download the 40-field supplier quotation comparison worksheet (CSV)
Review BESTCLEAN factory source documents · Send your requirements and open questions
Updated: 11 September 2026. This worksheet supports procurement review; it does not certify a supplier or replace engineering acceptance.