Hengtai Decoration & HENGTAI CLEAN Factory-Direct Solution: HENGTAI CLEAN manufactures all 3 tiers of SUS304/SUS316L cleanroom pass boxes: Static Electromagnetic Interlocked (between equal classes), Dynamic Self-Purifying Laminar Flow (ISO 5 internal wash), and VHP Vaporized Hydrogen Peroxide Bio-Decontamination Pass Chambers (6-log biological indicator kill).
1. 3-Tier Cleanroom Pass Box Engineering & Regulatory Selection Matrix
| Specification | VHP Bio-Decontamination Pass Box (HT-PB-VHP) | Dynamic Laminar Flow Pass Box (HT-PB-DYN) | Static UV Interlocked Pass Box (HT-PB-STA) |
|---|---|---|---|
| Target Regulatory Application | Grade C/D → Grade B/A Sterile Transfer (EU GMP Annex 1 / BSL-3) | Unclassified / ISO 8 → ISO 7 / Grade C Transfer | Equal Class Transfer (e.g., ISO 8 → ISO 8) |
| Decontamination Mechanism | 35% Flash-Vaporized H2O2 (6-Log Spore Reduction) + Catalytic Aeration (<1 ppm) | 0.45 m/s Vertical H14 Laminar Flow (ISO Class 5 Internal Recirculation) | 254nm UV-C Germicidal Lamp (Surface shadow limitation) |
| Chamber Material & Door Seal | 2.0mm SUS316L Mirrorless + Pneumatic Inflatable Silicone Seal | 1.5mm SUS304 + Flush Double-Glazed Tempered Glass Door | 1.2mm/1.5mm SUS304 + Mechanical/Magnetic Interlock |
| Validation & Instrumentation | Siemens PLC + 21 CFR Part 11 Audit Trail + PAO Port + H2O2 High/Low Sensors | Dwyer Magnehelic 0–500 Pa Gauge + DOP/PAO Injection Port + Adjustable Timer | Digital Interlock Indicator + UV Hour Counter |
| Factory-Direct FOB Price (600×600×600 mm) | Custom BOM Quote (24h Itemized BOQ) | Custom BOM Quote (24h Itemized BOQ) | Custom BOM Quote (24h Itemized BOQ) |
Complete 2026 Cleanroom & Purification 1v1 Engineering Comparison Matrix
1×40'HQ Pre-Engineered Modular Cleanroom Kit Cost, Lead Time & Grade-II EPC Comparison 2. Rockwool vs MgO vs Aluminum Honeycomb vs PIR Sandwich Panels
50mm/75mm/100mm Class A1 Fire Rating, Walk-On Ceiling Deflection & Moisture Resistance 3. Modular Hardwall Sandwich Panel Cleanroom vs Traditional Drywall Stud
12-Day Bolted Fit-Out, Zero Dust, Tax Depreciation & 90% Panel Reusability 4. Knock-Down (KD) Flat-Pack vs Fully Welded Monoblock SUS304 Air Shower
65% Ocean Freight Saving, 800mm Door Rigging Access & 25–28 m/s Nozzle Velocity 5. EC Brushless Modbus FFU vs AC FFU & Liquid Gel-Seal H14 vs Gasket HEPA
42% HVAC Energy Reduction, 10,000-Unit RS485 Control & Camfil/AAF/MayAir Benchmark 6. VHP Sterilization Pass Box vs Dynamic Laminar vs Static UV Pass Box
6-Log Spore Reduction for EU GMP Annex 1 Grade A/B vs Class 7/8 Buffer Transfer 7. PSA Oxygen-Fed Water-Cooled Ozone vs Air-Fed Ozone vs Chemical CIP
80–120 mg/L Concentration, Zero Chlorate/THM Residue & 24/7 Continuous Operation 8. Dual-Stage Desiccant Rotor Dehumidifier AHU vs Standard DX/Chilled Coil
-40°C to -60°C Dew Point Dry Room (Lithium Battery) & <20% RH Effervescent/Softgel Suite
2. Frequently Asked Engineering & Procurement Questions (FAQ)
Q: Why does EU GMP Annex 1 restrict UV-only pass boxes when transferring materials between different cleanliness grades?
A (Chief Engineer Tan Shuping · Grade-II EPC D244805460): UV-C light cannot penetrate shaded underside surfaces or folds of Tyvek bags and provides no active airborne particle scavenging when the outer door opens. Annex 1 requires active HEPA-filtered laminar flushing (Dynamic Pass Box) or validated sporicidal gas bio-decontamination (VHP Pass Box).
Q: How long is a complete VHP pass box cycle including aeration to <1 ppm H2O2?
A (Chief Engineer Tan Shuping · Grade-II EPC D244805460): Depending on chamber load, dehumidification + conditioning + 6-log sterilization + catalytic aeration takes 35–55 minutes with zero external duct exhaust required when fitted with our platinum catalytic converter.