Guangzhou Hengtai Turnkey Solution: Guangzhou Hengtai engineers the HT-JZP-RETROFIT Knock-Down Split-Section Hygienic AHU (2,500 to 60,000 m³/h | 1,500 to 35,000 CFM). Every functional module (mixing, G4/F8 filtration, chilled-water/DX dehumidification coil, EC brushless plug-fan array, electric/steam reheat, and H14 terminal section) ships in pre-gasketed sub-modules ≤850 mm (33.5 in) wide, bolts together inside your existing mechanical room in 48 hours, and wires directly to US 460V/480V 3Ph 60Hz or 380V 50Hz grids.
1. Complete Engineering Specification & FOB Factory Price Matrix
| Engineering Parameter / Module | Guangzhou Hengtai Factory Specification | Buyer Commercial & Operational Benefit |
|---|---|---|
| Model Series & Airflow Range | HT-JZP-RETROFIT-03 to HT-JZP-RETROFIT-60 (3,000–35,000 CFM / 5,000–60,000 m³/h) | Direct 1:1 drop-in capacity replacement for legacy Carrier, Trane, York & McQuay cleanroom units |
| Maximum Sub-Module Rigging Width | ≤ 850 mm (33.5 inches) × ≤ 1,950 mm height per split section | Passes through standard 36-inch (914 mm) single personnel doors and standard freight elevators with zero wall demolition |
| Cabinet Thermal-Break & Casing | EN 1886 Class L1 / TB2 / D1, 50mm high-density PU foam (48 kg/m³) with AISI 304 stainless steel inner liner | Zero condensation sweating at 7°C chilled water and zero fiber shedding into ISO 5–8 airstreams |
| Blower Technology Upgrade | Redundant N+1 EC Brushless Direct-Drive Plug-Fan Array (0–10V / RS485 Modbus VFD) | Eliminates belt dust, cuts fan electrical kWh by 32%–38%, and maintains airflow even if one fan is serviced |
| Dehumidification & Reheat Control | 6-row/8-row hydrophilic copper-fin cooling coil + SS316L sloped dry drain pan + SCR proportional electric reheat (or hot-gas/steam) + optional silica-gel desiccant wheel | Holds ±0.5 °C temperature and 35%–55% ± 3% RH for cGMP pharma, gummy curing, and electronics rooms |
| Electrical & Control Compatibility | UL 508A / CE / EAC compliant components; 460V/480V or 208–230V 3Ph 60Hz (North America) & 380–415V 3Ph 50Hz | Plug-and-play BACnet IP / Modbus RTU integration into existing Honeywell, Johnson Controls, or Siemens BMS |
| 3-Tier Factory Direct FOB Pricing | Custom BOM Quote (24h Itemized BOQ) (3,000–5,000 CFM) | Custom BOM Quote (24h Itemized BOQ) |
2. Monolithic Replacement vs. HT-JZP-RETROFIT Split-Module Rigging Comparison
When a 10-to-15-year-old cleanroom AHU reaches end-of-life, facility managers typically face a painful dilemma: tear down fire-rated corridor walls and halt cleanroom production for 2–3 weeks, or pay Custom BOM Quote (24h Itemized BOQ) to a local custom air-handler fabricator with a 20-week lead time. By pre-engineering the cabinet into precision cam-locked modules at our 26,000 m² Guangzhou manufacturing base, HENGTAI CLEAN delivers a factory-tested hygienic AHU in 14–18 working days that rolls straight through your existing doors.
3. 48-Hour Weekend Changeover SOP (Step-by-Step Field Protocol)
Step 1 (Friday Evening — 4 Hours): Isolate chilled-water/DX lines, lock out 460V/380V disconnect, and unbolt the legacy AHU casing.
Step 2 (Saturday Morning — 8 Hours): Roll in the pre-numbered HT-JZP-RETROFIT sections (Mixing → G4/F8 Filter → Cooling/Dehumidification Coil → EC Plug-Fan Array → HEPA H14 Terminal) through your 36-inch doorway, compress the double-lip EPDM labyrinth gaskets, and torque the internal tie-bolts.
Step 3 (Sunday — 8 Hours): Braze/flange coil headers, connect the single-point power & Modbus/BACnet cable, run automated positive-pressure casing leak verification (EN 1886 Class L1), and verify ISO 14644-1 room airflow and differential pressure cascades before Monday morning shift start.
4. 3-Step 24-Hour Nameplate-to-CAD Replacement Service
Send our engineering desk ( or WhatsApp ) a photo of your current unit's nameplate, the narrowest door width on your rigging path, and your target temperature/RH. We return a complete 2D/3D split-section rigging drawing, fan curve, and firm FOB/CIF quotation within 24 hours.
5. Frequently Asked Engineering & Procurement Questions (FAQ)
Q: How do you match our existing supply and return duct flanges without modifying our cleanroom ceiling?
A (Chief Engineer Tan Shuping): Simply text or email a smartphone photo of your existing AHU nameplate and a rough tape-measure sketch of the supply/return plenum openings. Within 24 hours, our CAD engineers generate a 1:1 custom transition plenum built directly into the HT-JZP-RETROFIT discharge and intake modules—zero main ductwork modification required.
Q: Can the HT-JZP-RETROFIT be assembled inside a tight mechanical room with no overhead crane?
A (Chief Engineer Tan Shuping): Yes. Each functional section weighs between 110 kg and 280 kg and is fitted with removable heavy-duty castor brackets and internal cam-lock compression latches with EPDM closed-cell food-grade gaskets. Two HVAC technicians using a standard pallet jack and chain hoist can assemble and pressure-test a 10,000 CFM unit over a single Saturday–Sunday shutdown.
Q: Do you support US 460V/480V 3-Phase 60Hz power and UL-recognized electrical components?
A (Chief Engineer Tan Shuping): Yes. For US, Canadian, and Latin American buyers, we equip the control cabinet with Schneider/ABB UL-listed circuit breakers, contactors, phase-loss relays, and 460V/60Hz rated EC fans, and perform a full 60Hz factory frequency-converter load test recorded on video prior to shipment.
Related Cleanroom HVAC & EPC Engineering Cluster (9-Link Technical Matrix)
EN 1886 L1/TB2 50mm PU thermal-break cabinets 2. EN 1886 ACMV & Constant Temp/RH Spec
Psychrometric control ±0.5°C & ±3% RH 3. Desiccant Rotor AHU vs Chilled-Water DX
Low dew-point (-40°C to -60°C) comparison 4. Turnkey Modular Cleanroom Fit-Out
Grade-II EPC license D244805460 5. PCB & Semiconductor ISO 5–8 Cleanroom
ESD sandwich panels & EC FFU ceiling grid 6. FDA cGMP & HACCP Low-RH Cleanroom
30%–40% RH gummy & nutraceutical suites 7. 1×40'HQ Containerized Cleanroom Kit Guide
Pre-numbered panels & BOI/Form E customs 8. Cleanroom Engineering Knowledge Hub (/learn/)
Complete SOPs, airflow formulas & checklists 9. 2026 Global Cleanroom Procurement Trends (/trends/)
Live buyer specifications & BOM benchmarks
Related Engineering Cluster References (Insights · Knock Down Split Cleanroom Ahu Retrofit No Wall Demolition)
Cross-reference this technical specification `insights/knock-down-split-cleanroom-ahu-retrofit-no-wall-demolition.html` with our primary factory modules: 1. Turnkey Cleanroom EPC · 2. Hygienic ACMV & AHU · 3. Sandwich Panels & Doors · 4. SUS304 Air Showers · 5. VHP & Dynamic Pass Boxes · 6. PSA Ozone Skids · 7. EC FFU & H14 HEPA · 8. Boot Washers · 9. Full 1-Click Sitemap.
Request a 24-Hour Turnkey Cleanroom & Equipment BOQ
Looking for factory-direct pricing without middleman markups? Send our cleanroom HVAC and stainless equipment engineers your layout, target ISO 14644-1 class, or equipment list.
- Stage-1 Budgetary Quote in 4–24 Hours: Itemized EXW / FOB Guangzhou / CIF / DDP unit pricing & container load plan.
- Free Engineering Value-Add: AutoCAD room pressure cascade review, CFM/ACH air-change calculation & utility matrix.
- Download Technical Dossiers: 6 A4 Engineering Spec Sheets (PDF) →
Email: · WhatsApp: