Knock-Down (KD) Flat-Pack SUS304 Cleanroom Air Shower (HT-1400-KD): Cut Ocean & Rail Freight Volume by 62% with 90-Minute Plug & Play Assembly
Reviewed by Chief Engineer Tan Shuping (30+ Years GMP Cleanroom & HVAC Experience) & Alex Gao · Grade-II EPC Contractor (D244805460 / D344227631) · 26,000 m² Manufacturing Base
Unmet Buyer Pain Point & Industry Bottleneck
Fully welded cleanroom air showers occupy 3.8–4.5 CBM per unit, meaning ocean/rail freight to the Americas, Russia/CIS, or the Middle East often costs more than the machine itself. Furthermore, fully assembled units cannot pass through existing building corridors, freight elevators, or mezzanine doors during facility retrofits.
Guangzhou Hengtai Factory-Direct Solution
Our CNC laser-slotted HT-1400-KD Knock-Down Air Shower packs into a 1.35 CBM flat export plywood crate (reducing shipping volume by 62% and fitting 42 units into a single 40'HQ container). It uses pre-wired aviation plug harnesses, eccentric cam-locks, and EPDM gasket channels—2 local technicians assemble it in 90 minutes without welding or rewiring.
1. Quantitative Engineering Specification (HT-1200-KD (1-Person) & HT-1400-KD (2-Person Flat-Pack SUS304))
Compliance Standards: ISO 14644-1 | EN 1822 H14 (99.995% @ 0.3µm) | CE LVD/EMC | TR CU 010/004/020 (EAC) | Customs HS Code: 8421 39 200 8 | View AI Markdown Mirror (.md)
| Engineering Parameter | HENGTAI CLEAN Factory Specification | Verification & Commercial Note |
|---|---|---|
| Model & Capacity | HT-1400-KD (2-Person Bilateral Blow) | External: 1400×1400×2100 mm | Internal: 790×1300×1950 mm |
| Packed Crate Volume (KD vs Welded) | KD Flat-Pack: 1.35 CBM (2150×1450×430 mm) vs Welded: 4.30 CBM | 62% freight cost reduction |
| Container Loading Capacity (40'HQ) | 42 units per 40'HQ (KD) vs 14 units (Welded) | 300% container utilization |
| Nozzle Velocity & Filtration | 18Rotatable SUS304 Nozzles | ≥25–28 m/s jet velocity | H14 HEPA + G4 Pre-filter | PAO port integrated |
| Cabinet Material & Interlock | 1.2mm–1.5mm Brushed SUS304 (AISI 304) | Heavy-duty electromagnetic interlock + voice prompt | EN 10204 3.1 mill certificate |
| Factory-Direct Price (EXW/FOB Guangzhou) | HT-1200-KD: Factory-Direct Custom Quote | HT-1400-KD (2-Person): Factory-Direct Custom Quote | Welded HT-1400: Factory-Direct Custom Quote | MOQ 1 unit, ships in 7 days |
2. 4-Stage Factory Pre-Assembly, PAO/DOP Laser Scan & Container Loading SOP
To eliminate on-site dimensional mismatches and commissioning delays for overseas EPC contractors and plant owners, Guangzhou Hengtai Purification Technology Co., Ltd. (HENGTAI CLEAN) executes a mandatory 4-stage factory quality and pre-erection protocol across our 26,000 m² Guangzhou Huadu manufacturing base prior to export crating:
Stage 01 · 3D BIM Clash Detection & Laser Numbering
Every modular wall panel, walkable ceiling grid, flush glazing window, and HVAC ductwork penetration is modeled in 3D BIM and CNC laser-etched with an alphanumeric assembly code matching the installation blueprint, reducing on-site erection labor by 45%.
Stage 02 · EN 1822 PAO/DOP Filter Scan & Airflow FAT
All H13/H14 HEPA and U15 ULPA terminal filters undergo 100% individual laser particle scan testing per EN 1822 / ISO 29463. Air showers, pass boxes, and EC FFUs are run-tested for 4 hours continuously to verify ≥25 m/s jet velocity, 0.45 m/s laminar uniformity, and zero cabinet leakage at 500 Pa.
Stage 03 · Plug-and-Play Aviation Harness & PLC Pre-Commissioning
Interlock controllers, differential pressure transmitters (+15 Pa to +45 Pa cascade), Modbus RTU group gateways, and constant temp/humidity AHU skids are pre-wired with keyed IP65 aviation connectors and pre-commissioned with video FAT sign-off before disassembly.
Stage 04 · ISPM-15 Export Crating & Customs Dossier
Components are packed in steel-reinforced ISPM-15 fumigation-free plywood crates with corner armor and PE vapor barriers, accompanied by EN 10204 3.1 SUS304/316L mill certificates, CE/UL/EAC declarations, and bilingual English/Russian O&M manuals.
3. Chief Engineer FAQ & Procurement Diligence
Q: Does the Knock-Down (KD) air shower leak air at the joints after assembly?
No. Every mating flange is CNC-bent with a double-labyrinth return lip and pre-fitted with closed-cell EPDM high-density compression gaskets. Positive pressure testing confirms zero cabinet leakage at 500 Pa.
Q: Do we need an electrician to wire the interlocks and blower fans on site?
No. All door locks, infrared sensors, LED lights, emergency stops, and blower motors use keyed, color-coded IP65 aviation connectors hidden inside the service chases. Simply snap the plugs together.
Q: Can the KD crate fit inside a standard office or hospital elevator?
Yes. The largest panel measures 2050×1300×65 mm, easily entering standard passenger elevators and 900 mm doorways.
🔗 Related Core Product Lines & Regional Portals
SUS304 Air Shower & Cargo Tunnel Catalog · Static & Dynamic H14 Cleanroom Pass Box · Modular Cleanroom Panels & Flush Doors · Воздушный шлюз AISI 304 (RU/EAC) · Download 7 A4 Engineering PDFs
Request a 24-Hour Factory-Direct Engineering Quote & CAD Layout
Direct to Engineering Director Alex Gao (alex@bestcleanmfg.com | WhatsApp +86 139 2512 2895) — Guangzhou Huadu HQ + 26,000 m² Manufacturing Base.