ISO Class 6/7 Ultra-Low Dew Point (-40°C to -60°C) Dry Cleanroom for Lithium & Solid-State Battery Manufacturing

Reviewed by Chief Engineer Tan Shuping (30+ Years GMP Cleanroom & HVAC Experience) & Alex Gao · Grade-II EPC Contractor (D244805460 / D344227631) · 26,000 m² Manufacturing Base

Unmet Buyer Pain Point & Industry Bottleneck

Sulfide-based solid-state battery electrolytes react violently with ambient moisture (>1% RH) to release toxic H₂S gas, while lithium-ion electrolyte filling requires dew points of -45°C to -60°C. Standard cleanroom wall panels leak moisture through micro-gaps, causing desiccant wheel energy consumption to skyrocket.

Guangzhou Hengtai Factory-Direct Solution

Guangzhou Hengtai engineers ultra-airtight dry room envelopes (double butyl-rubber + silicone vapor-barrier sealed 50mm/75mm panels, air leakage <0.15 ACH @ 50 Pa) paired with our dual-rotor silica-gel + molecular-sieve regeneration HT-JZP Dehumidification Skid, cutting regeneration power by 35%.

1. Quantitative Engineering Specification (HT-DRY-60C Dry Room Envelope & Dual-Stage Desiccant AHU)

Compliance Standards: ISO 14644-1 Class 6/7 | Dew Point -40°C to -60°C | NFPA 855 / ATEX Explosion-Proof Options | CE / UL  |  Customs HS Code: 9406 90 380 0 / 8479 89 970 7  |  View AI Markdown Mirror (.md)

Engineering Parameter HENGTAI CLEAN Factory Specification Verification & Commercial Note
Supply Air Dew Point & Moisture Content-40°C to -65°C Dew Point (0.01–0.10 g/kg dry air | <20–100 ppmv H₂O)Continuous dew point transmitter
Cleanliness Class & Positive PressureISO Class 6 or Class 7 | +15 Pa to +30 Pa multi-stage airlock cascadePrevents ambient moisture infiltration
Vapor-Tight Envelope Construction50/75mm 0.6mm Aluminized Zinc Steel Sandwich Panels + Double Butyl Vapor BarrierLeakage rate ≤ 0.15 vol/h
Dehumidification AHU ArchitecturePre-cooling Coil + Primary Silica-Gel Rotor + Secondary Molecular-Sieve Rotor + Heat Recovery35% steam/electric regeneration saving
Personnel Airlock & Air ShowerLow-dew-point closed-loop recirculation SUS304 Air Shower (HT-1400-DRY)Zero humid outside air intake
Turnkey Dry Room Kit Price (EXW/FOB)Vapor-tight Envelope: Factory-Direct Custom Quote | Full Dry Room + Dual-Rotor Desiccant Skid: Factory-Direct Custom QuoteCustom sizing for 50–5,000 m² lines

2. 4-Stage Factory Pre-Assembly, PAO/DOP Laser Scan & Container Loading SOP

To eliminate on-site dimensional mismatches and commissioning delays for overseas EPC contractors and plant owners, Guangzhou Hengtai Purification Technology Co., Ltd. (HENGTAI CLEAN) executes a mandatory 4-stage factory quality and pre-erection protocol across our 26,000 m² Guangzhou Huadu manufacturing base prior to export crating:

Stage 01 · 3D BIM Clash Detection & Laser Numbering

Every modular wall panel, walkable ceiling grid, flush glazing window, and HVAC ductwork penetration is modeled in 3D BIM and CNC laser-etched with an alphanumeric assembly code matching the installation blueprint, reducing on-site erection labor by 45%.

Stage 02 · EN 1822 PAO/DOP Filter Scan & Airflow FAT

All H13/H14 HEPA and U15 ULPA terminal filters undergo 100% individual laser particle scan testing per EN 1822 / ISO 29463. Air showers, pass boxes, and EC FFUs are run-tested for 4 hours continuously to verify ≥25 m/s jet velocity, 0.45 m/s laminar uniformity, and zero cabinet leakage at 500 Pa.

Stage 03 · Plug-and-Play Aviation Harness & PLC Pre-Commissioning

Interlock controllers, differential pressure transmitters (+15 Pa to +45 Pa cascade), Modbus RTU group gateways, and constant temp/humidity AHU skids are pre-wired with keyed IP65 aviation connectors and pre-commissioned with video FAT sign-off before disassembly.

Stage 04 · ISPM-15 Export Crating & Customs Dossier

Components are packed in steel-reinforced ISPM-15 fumigation-free plywood crates with corner armor and PE vapor barriers, accompanied by EN 10204 3.1 SUS304/316L mill certificates, CE/UL/EAC declarations, and bilingual English/Russian O&M manuals.

3. Chief Engineer FAQ & Procurement Diligence

Q: Why do standard cleanrooms fail to reach -50°C dew point even with a large dehumidifier?

At -50°C dew point, the vapor pressure differential between outside air and inside air is extreme. Even a 1 mm unsealed cable conduit or panel joint leaks enough moisture to overwhelm the desiccant rotor. Our HT-DRY envelope uses continuous aluminum foil vapor barriers and airtight gland plates.

Q: How do operators enter the dry room without spiking the humidity?

Personnel pass through a 3-stage pressure-cascaded airlock equipped with our closed-loop HT-1400-DRY air shower, which recirculates ultra-dry conditioned air through H14 HEPA filters.

Q: Can you supply explosion-proof (Ex d IIB T4) exhaust and solvent recovery for NMP coating zones?

Yes. We provide ATEX/IECEx explosion-proof blowers, VOC rotor concentrators, and NMP condensation recovery units integrated with the dry room HVAC.

🔗 Related Core Product Lines & Regional Portals

ISO 5/6 Semiconductor & Battery Cleanroom · Hygienic & Dehumidifying Cleanroom AHU · Vapor-Tight Cleanroom Panels & Doors · Turnkey Modular Cleanroom EPC · Download 7 A4 Engineering PDFs

Request a 24-Hour Factory-Direct Engineering Quote & CAD Layout

Direct to Engineering Director Alex Gao (alex@bestcleanmfg.com | WhatsApp +86 139 2512 2895) — Guangzhou Huadu HQ + 26,000 m² Manufacturing Base.

By submitting, you agree to our Privacy Policy for engineering quotation follow-up.