CLEANROOM PROJECTS & EQUIPMENT
[email protected]  ·  WA +86 139 2512 2895  ·  EN · 中文 · VI · TH · MS · ES · RU
HOME / INDUSTRIES / FOOD PROCESSING CLEANROOM

Food Processing Cleanrooms

Class 100,000 production halls, hygiene zoning from raw to ready-to-eat, and washdown-rated stainless lines — engineered to pass the audit your buyer will send.

HACCPCLASS 100KGB 50073

What a food auditor actually checks

  • Zoning: general → quasi-clean → clean production zones with pressure steps and interlocked transfers — we design the personnel/material flow map first, not last
  • Class 100,000 (ISO 8) for inner-packing and RTE cooling rooms; Class 300K for processing halls — per food GMP zoning tables
  • Hygiene line at every entry: lockers → sensor hand-wash → disinfection → boot wash → air shower, all SUS304 washdown-rated
  • Air disinfection during production: AIS ionization units and scheduled ozone cycles for empty-room sanitation
  • Materials that survive washdown: 50mm sandwich panels, coved corners, epoxy floors, IP-rated fittings
Request an Engineering Review
Food processing clean workshop Class 100000 with epoxy floorCLASS 100K
Food Processing Cleanroom equipment
Food Processing Cleanroom equipment
Food Processing Cleanroom equipment

Typical zoning & class map (food GMP)

ZONEROOMSCLASSKEY EQUIPMENT
GeneralRaw material store, outer packingImpact doors, ozone (scheduled)
Quasi-cleanProcessing, heat treatment300KPurification AC, hygiene line
CleanCooling, inner packing, RTE100K (ISO 8)HEPA outlets, air shower, pass box, AIS

REFERENCE VALUES — FINAL DESIGN IS ENGINEERED TO YOUR PRODUCT AND AUDIT SCHEME.

Equipment for this industry — from our own line

Food cleanroom planning: scope, installation and acceptance

Planning Guide

Food cleanroom planning: scope, installation and acceptance

READ GUIDE →
TECHNICAL SCOPE & PROJECT REVIEW

"Send me your floor plan. I'll tell you what it really costs."

Define the technical requirements, responsible reviewers and acceptance records for your project.

Ask the Engineer

Frequently asked questions

What cleanroom class does a food factory need?

Inner packing and ready-to-eat cooling rooms are typically Class 100,000 (ISO 8); processing halls Class 300,000. We map every room to food GMP zoning tables in the free project review.

Can you build around an operating production line?

Yes — phased construction and mobile purification AC let us upgrade cleanliness without stopping production; typical changeover per zone is 7-14 days.

Do you provide documents for HACCP audit?

Handover includes third-party particle and microbial test reports plus as-built drawings — the environmental-control evidence HACCP and BRC auditors request.

What does a food cleanroom cost per m²?

Class 100K food cleanrooms typically run USD 120-220 per m² all-in depending on HVAC scope. Send your floor plan for an itemized project quotation.

Planning a food processing cleanroom?

Send a floor plan, application and target conditions. Confirm the review scope, equipment requirements and quotation schedule.

Start My Proposal
💬 WhatsApp