🏭 Cleanroom Turnkey Solutions & Equipment — Factory Direct from China
✉️ [email protected]  |  📱 WhatsApp: +86 138 0000 0000  |  EN · 中文 · VI · TH · MS · ES · RU
Home / Turnkey Cleanroom Solutions

Turnkey Cleanroom Design & Construction

ISO 7 / ISO 8 / GMP clean workshops for food, pharmaceutical, cosmetics and electronics factories — design, materials, equipment and installation supervision from one contract.

One Source, Full Responsibility

A cleanroom project usually involves a designer, a panel supplier, an HVAC contractor, an equipment vendor and an installer — five companies pointing fingers at each other when something goes wrong. BESTCLEAN replaces them all:

  • Design: layout, airflow, pressure cascade and personnel/material flow engineered to ISO 14644 & GMP; 3D drawings and equipment schedule in 48h
  • Materials: cleanroom sandwich panels, cleanroom doors and windows, epoxy flooring accessories — supplied direct
  • Equipment: air showers, pass boxes, FFU/HEPA terminals, AHU purification units, ozone systems — made in our own factory
  • Installation: our supervisors lead your local crew, or full EPC team for larger projects
  • Validation: third-party particle-count & microbial testing report on handover
Send Floor Plan — Free Proposal
Cleanroom construction project corridor with observation windows

From bare shell to Class 100K — drag to compare

Cleanroom after handover
Factory shell before cleanroom fit-out
BEFORE · BARE SHELLAFTER · CLASS 100K

REPRESENTATIVE TRANSFORMATION · TYPICAL SCOPE 30–45 DAYS ON SITE

Cleanliness Classes We Build

Class (US FED 209E)ISO 14644Typical UseTypical Zones
Class 100ISO 5Sterile filling, laboratory laminar zonesFFU ceiling work zones, laminar hoods
Class 10,000ISO 7Pharmaceutical preparation, cosmetics filling, medical devicesCore production rooms
Class 100,000ISO 8Food processing, beverage, packaging materials, electronics assemblyProduction halls, inner packing rooms
Class 300,000General production zones, warehouses, pre-processingSupport areas

Full production-environment planning per food GMP / HACCP: general production zone → quasi-clean zone → clean production zone, with personnel purification (air shower, hand-wash & disinfection, changing rooms) and material purification (pass box, cargo shower) at every boundary.

Three Delivery Models

A. Design + Material Package

We engineer the cleanroom and ship a complete kit — panels, doors, FFUs, AHU, air showers, pass boxes — with installation drawings and video guidance. Your team or local contractor installs. Best for remote markets and experienced buyers.

B. Supervised Installation ★ Most Popular

Everything in Model A, plus our site supervisors (2–3 engineers) lead local labor through installation, commissioning and testing. Available across Vietnam, Thailand, Indonesia, Malaysia, the Philippines and Cambodia.

C. Full Turnkey EPC

Complete engineering-procurement-construction with our own installation team, for projects above ~1,000 m² or GMP-critical facilities. Fixed price, fixed schedule, single point of responsibility.

Project Gallery

Food clean workshop with epoxy flooring
Cleanroom with steel doors and vision panels
Food production line inside ISO 8 cleanroom
FFU ceiling cleanroom under commissioning

Get a budget in 48 hours

Send four things: floor plan (or room size), industry, target class, country — we return layout + equipment list + budget.

Start My Project
💬 WhatsApp