# HEPA and FFU Procurement: Evidence, Interfaces and Acceptance

> **Canonical Page**: https://www.bestcleanmfg.com/resources/hepa-ffu-procurement  
> **Summary**: Compare a HEPA filter or fan filter unit using the specified test method, rated operating conditions and installation interface. A filter performance claim.  
> **Manufacturer & EPC Entity**: Guangzhou Hengtai Purification Technology Co., Ltd. / Guangdong Hengtai Design & Engineering Co., Ltd. (HENGTAI CLEAN · Credit Code `91440101MA59M8NW4E` · Grade-II EPC `D244805460` & `D344227631` · `26,000 m²` 4 Bases · `RMB 38,000,000` Registered Capital · `63 Patents` · ISO 9001 `90924Q00571R0M` · CE · EAC)  
> **Direct Engineering Desk**: Alex Gao — WhatsApp/Tel `+86 139 2512 2895` · Email `alex@bestcleanmfg.com`

***

Compare a HEPA filter or fan filter unit using the specified test method, rated operating conditions and installation interface. A filter performance claim alone does not establish the performance of the installed room.

## Use a comparable specification

| Field | Buyer requirement | Evidence to request |
| --- | --- | --- |
| Filter classification | Required classification and applicable method | Report identifying model and test basis |
| Airflow | Design airflow and operating point | Performance data at stated conditions |
| Pressure | Clean-filter pressure and system allowance | Pressure data and stated units |
| Interface | Dimensions, seal arrangement and ceiling system | Approved drawings and sealing details |
| FFU electrical | Voltage, frequency and control protocol | Wiring, control and service documentation |
| Maintenance | Access, replacement and spare filters | Replacement dimensions and maintenance instructions |

## Match reports to the supplied item

Check report issuer, date, sample or model identification, test method, conditions and result. A generic brochure is different from a model-specific test report. Confirm which evidence is included with the order and which checks take place after installation.

## Review installation as a separate acceptance stage

Transportation, seals, installation workmanship and the surrounding airflow system affect the installed result. Agree installation checks and any site testing with the responsible project engineer. Do not infer room qualification from a filter label.

## Compare ownership costs without inventing savings

Request power consumption at the proposed operating point, replacement-filter information and access requirements. Compare alternatives using the same operating hours and electricity assumptions. Any cost estimate should state its inputs, exclusions and sensitivity to actual use.

## Prepare the RFQ

Send application, target operating conditions, quantity, dimensions, ceiling or duct interface, control requirements and destination. Request confirmation of the exact configuration, report availability, delivery scope and project-specific acceptance plan.

## Scope and next step

This is a procurement planning checklist, not a project design, certification or acceptance report. Requirements and document availability must be confirmed for the specific order.

Published 11 September 2026 · HENGTAI CLEAN website team. For a project-specific review, contact alex@bestcleanmfg.com .

Submit your requirements View related equipment and services

## Verify the supplier before approving the order

Identify the contracting seller, actual manufacturer and local installer separately. A brochure or certificate held by another company needs a documented relationship and an applicable scope; a company name alone does not verify the proposed equipment.

- Before quotation: define the process, destination, configuration and interfaces.
- Before ordering: reconcile the legal entities, supporting documents, acceptance criteria, price and responsibility split.
- Before shipment: check the approved drawing revision, inspection record, traceability and packing documents.
- At site: confirm installation readiness, agreed tests, outstanding items and maintenance handover.

Download the 28-point supplier verification worksheet (CSV) . Record each answer, document reference, reviewer and decision. Treat a blank answer as pending. This is a buyer planning tool; document availability and contractual commitments must be agreed for each order.

Send your requirements and document questions

## Filter rating and installed integrity are different checks

FDA guidance for aseptic drug manufacturing distinguishes efficiency testing used to determine a filter rating from leak testing of the installed media, frame and seal. This pharmaceutical guidance does not make every industrial cleanroom subject to the same requirements. FDA — Aseptic Processing Guidance, section IV.D.2 .

Review the manufacturer document sources .

## Related procurement guides

- Cleanroom RFQ Checklist: Compare Scope Before Price
- Pass Box Selection: Static, Dynamic and Transfer Requirements

## Choose Your Ready-to-Ship Modular Cleanroom Kit (Solutions A to E: 57.1 m² – 86.5 m²)

Don't know how to partition your warehouse into a compliant ISO 14644-1 / GMP / ISO 22716 cleanroom? Our 100-engineer design institute pre-engineered 5 standardized modular cleanroom floor plans (Solutions A, B, C, D, E) . Watch the bilingual 3D walkthrough videos below and click any model to lock in factory-direct container pricing:

### Solution A — 57.1 m² Max-Filling Cleanroom Kit

Maximizes primary production space (41.4 m²) with 3-stage personnel gowning and high-speed roll-up cargo air shower.

### Solution B — 57.1 m² Dual-Zone + Material Holding

Dedicated 13.2 m² Material Holding Room + flush interlocked SUS304 Pass Box for strict packaging segregation.

### Solution C — 61.1 m² Long-Span Conveyor Line Kit

Engineered for automated filling/packaging lines requiring an unobstructed 46.4 m² linear clean hall.

### Solution D — 61.1 m² Full 4-Stage GMP & Dual Airlock

Our highest-spec GMP layout featuring separate 1st & 2nd gowning rooms, material holding room, and cargo shower.

### Solution E — 86.5 m² Panoramic Showpiece Cleanroom

Designed for brand owners needing a high-visibility 10-window VIP viewing facade plus full personnel & cargo airlocks.

### Need a Custom Size or Multi-Floor Smart Factory?

Led by 30+ Year GMP Chief Engineer Mr. Tan Shuping and Chief Architect Mr. Liu Wei , we deliver 9 integrated Design+Build modules across 4 National Bases (Guangzhou HQ, Shanghai, Zhejiang Huzhou Cosmetics Town, Hunan) :

## Verified Government EPC Licenses (RMB 38,000,000 Capital) & 63 National Patents

Unlike trading brokers with zero construction qualifications, our contracting entity Guangdong Hengtai Design Engineering Co., Ltd. (Unified Social Credit Code: 91440101MA59M8NW4E , Legal Rep: Mr. Tan Cheng , Registered Capital: RMB 38,000,000 ) and manufacturing entity Guangzhou Hengtai Purification Technology Co., Ltd. (National High-Tech Cert: GR202444009466 , ISO 9001 Cert: 90924Q00571R0M ) hold full government licenses and 63 National Patents + 19 Software Copyrights . 📥 Download Official Red-Stamp License Dossier (PDF) →

## Guangzhou Hengtai Hytek Group (HENGTAI CLEAN): 5-Pillar Turnkey Ecosystem

Founded in 2012 by Chairman Mr. Tan Cheng and headquartered in Guangzhou (Zhuomei Building South Tower, Huadu District, 15 mins from CAN Airport) with a 26,000 m² smart manufacturing base, Guangzhou Hengtai Hytek Group integrates five specialized engineering & manufacturing companies into one unified contract:

### Guangzhou Hengtai Purification Technology Co., Ltd.

Direct CNC sheet-metal & cleanroom equipment manufacturer: SUS304/316L air showers, dynamic laminar pass boxes, H14 gel-seal FFUs, hygienic AHUs, PSA ozone systems, and HT-II boot washers.

### Hengtai Meiye Architectural Design Institute

Backed by design directors from Tsinghua University Academy of Fine Arts , University of the Arts London (Chelsea) & Guangzhou Academy of Fine Arts . Pioneers of "Marketing Factories" & spiral AR VIP Visiting Corridors .

### Guangdong Hengtai Design Engineering Co., Ltd.

Holds national Grade-II Mechanical & Electrical Installation and Grade-II Building Decoration Contractor licenses. Executes ISO 5–8 cleanrooms, sanitary process piping, and epoxy/AGV flooring.

### Guangdong Guochuang Energy Saving Technology Co., Ltd.

Specializes in heat-recovery cleanroom HVAC, low-dew-point rotor dehumidification (RH <40%), building photovoltaic integration, and smart energy monitoring.

### Guangzhou Hengtai Hytek Group Co., Ltd.

Group holding headquarters & regulatory compliance center. Co-founder of the 2025 Hengtai × Ruikong International AI Intelligent Manufacturing Digital Factory (3-in-1 BIM + Process + AGV Logistics simulation cutting construction time by 30%).

### Walk Inside Our Modular GMP Cleanroom in 720° VR

Inspect flush wall panels, coved corners, double-glazed observation windows, ceiling HEPA diffusers, and epoxy floors interactively in 3D VR.

## Authoritative Leadership & 30+ Year Chief Engineering Directorate

Every turnkey cleanroom blueprint and equipment BOM at HENGTAI CLEAN is personally governed by China's top cosmetics, pharmaceutical, and architectural engineering veterans:

### Mr. Tan Cheng

Entered the cosmetics & health manufacturing sector in 2004, founded Tailenju GMP Consulting in 2012 and Guangzhou Hengtai Purification Technology Co., Ltd. in 2015. Pioneered the integration of ISO/GMP cleanroom engineering with architectural brand aesthetics, scaling group output past RMB 100M within 3 years and 1,500+ benchmark factories.

### Mr. Tan Shuping

30+ years of executive GMP factory planning & cleanroom engineering . Director of the Intelligent Equipment Committee of China Cosmetics IUR Collaborative Innovation Platform; Advisor to Jiangsu Daily Chemical Industry Association; former Director of Suzhou Boke & GM of Shanghai Kemei. Enforces Hengtai's signature standard: "Southern Jiangsu Workmanship, Southern China Service."

### Mr. Liu Wei

Educated at Tsinghua University Academy of Fine Arts and Chelsea College of Arts (University of the Arts London) . Leads our 100-person BIM+ architectural & cleanroom design institute. Directed landmark projects for Shanghai Fosun Pharma, Fuerjia Northern Beauty Valley, Proya, Marubi, Xiaomi HQ, Siemens, and ABB .

## Trusted by 1,000+ Listed Pharma, Cosmetics & Food Giants (Verified Jobsite Records)

From 30-ton/day vacuum emulsifying halls and Class 10,000 sterile suites to spiral AR VIP Visiting Corridors , explore authentic, GPS-watermarked engineering logs from Guangzhou Hengtai:

Panoramic glazed inspection gallery overlooking 304/316L vacuum homogenization & sanitary process piping.

8+ vacuum emulsifying pots (50kg–2000kg) with flush interlocked pass boxes & airtight steel doors.

100% precision delivery from AutoCAD blueprint and BIM twin to actual completed physicochemical lab.

Authentic timestamped construction logs: weighing rooms, emulsifying suites, and high-speed airlocks.

Flush-mounted Magnehelic differential pressure gauges (+15 Pa to +30 Pa) & calibrated thermo-hygrometers.

Orbital TIG-welded hygienic stainless steel utility & purified water transfer manifolds on site.

Chief Engineer Mr. Tan Shuping and our engineering delegation at Booth N4K09.

Grand launching ceremony of our AI-Enhanced Smart Manufacturing Digital Plant in Guangzhou.

## Request a 24-Hour Turnkey Cleanroom & Equipment BOQ

Looking for factory-direct pricing without middleman markups? Send our cleanroom HVAC and stainless equipment engineers your layout, target ISO 14644-1 class, or equipment list.

- Stage-1 Budgetary Quote in 4–24 Hours: Itemized EXW / FOB Guangzhou / CIF / DDP unit pricing & container load plan.
- Free Engineering Value-Add: AutoCAD room pressure cascade review, CFM/ACH air-change calculation & utility matrix.
- Download Technical Dossiers: 6 A4 Engineering Spec Sheets (PDF) →

## Compare quotations on the same scope

Ask each supplier to answer the same requirements and identify the evidence for its proposed configuration. An unanswered field is an open question, not proof that a supplier cannot meet the requirement. Availability and acceptance criteria must be confirmed for your order.

| Comparison field | What to request |
| --- | --- |
| Supply boundary | Identify whether filter, motor, controller and installation accessories are included |
| Filter evidence | Selected classification, test method and report identity |
| Air duty point | Airflow and available pressure at a stated operating condition |
| Power and noise | Voltage, frequency, power and noise test conditions |
| Control interface | Local or group control, supported interface and commissioning responsibility |
| Ceiling and service access | Mounting, weight support, service side and clearance |
| Replacement parts | Filter dimensions, gasket arrangement and compatible replacement identification |
| Acceptance | Factory test records and agreed installed-system tests; distinguish the two |

Download the 40-field supplier quotation comparison worksheet (CSV)

Review HENGTAI CLEAN factory source documents · Send your requirements and open questions

Updated: 11 September 2026. This worksheet supports procurement review; it does not certify a supplier or replace engineering acceptance.
