# Cleanroom RFQ Checklist: Compare Scope Before Price

> **Canonical Page**: https://www.bestcleanmfg.com/resources/cleanroom-rfq-checklist  
> **Summary**: Step-by-step cleanroom RFQ preparation checklist: room dimensions, ceiling height, target ISO/GMP class, heat loads, utilities & layout submission for 24h BOQ.  
> **Manufacturer & EPC Entity**: Guangzhou Hengtai Purification Technology Co., Ltd. / Guangdong Hengtai Design & Engineering Co., Ltd. (HENGTAI CLEAN · Credit Code `91440101MA59M8NW4E` · Grade-II EPC `D244805460` & `D344227631` · `26,000 m²` 4 Bases · `RMB 38,000,000` Registered Capital · `63 Patents` · ISO 9001 `90924Q00571R0M` · CE · EAC)  
> **Direct Engineering Desk**: Alex Gao — WhatsApp/Tel `+86 139 2512 2895` · Email `alex@bestcleanmfg.com`

***

A cleanroom quotation is comparable only when the process, room conditions, scope boundaries and acceptance responsibilities are defined. Send a layout and process description before requesting a firm price.

## Define the operating requirement

Document the intended process, product exposure, personnel and material routes, room dimensions, ceiling height and operating hours. Identify the destination and local design authority. A room classification alone does not specify the complete facility.

## Make the quotations comparable

| RFQ field | Buyer input | Quotation check |
| --- | --- | --- |
| Layout and flows | Marked plan with room names and routes | Same usable area and boundary in every offer |
| Environmental conditions | Required temperature, humidity and pressure relationships | Design basis and operating assumptions stated |
| Utilities | Available voltage, frequency, cooling and drainage | Connections and excluded utility upgrades identified |
| Scope | Panels, HVAC, electrical, controls, equipment and installation | Each item assigned to buyer, supplier or local contractor |
| Acceptance | Tests, methods, operating state and responsible parties | Witnessing, instruments, reporting and retest costs agreed |

## Separate equipment supply from local construction

Ask who provides drawings, permits, installation labour, commissioning and maintenance. Remote engineering support is different from an on-site construction commitment. Record the destination, access constraints and division of responsibility in the contract.

## Agree the document and acceptance sequence

Use a written sequence: requirements review; approved drawings; agreed equipment specifications; factory inspection where applicable; shipping documents; installation checks; site acceptance. Define how a design change affects price and schedule before approving it.

## Questions to resolve before paying a deposit

What starts the lead-time clock? Which documents must the buyer approve? What is excluded from freight, duties, unloading and installation? Who corrects a failed acceptance test? Which spare parts and warranty procedures are included? Obtain written answers for the specific order.

## Scope and next step

This is a procurement planning checklist, not a project design, certification or acceptance report. Requirements and document availability must be confirmed for the specific order.

Published 11 September 2026 · HENGTAI CLEAN website team. For a project-specific review, contact alex@bestcleanmfg.com .

Submit your requirements View related equipment and services

## Verify the supplier before approving the order

Identify the contracting seller, actual manufacturer and local installer separately. A brochure or certificate held by another company needs a documented relationship and an applicable scope; a company name alone does not verify the proposed equipment.

- Before quotation: define the process, destination, configuration and interfaces.
- Before ordering: reconcile the legal entities, supporting documents, acceptance criteria, price and responsibility split.
- Before shipment: check the approved drawing revision, inspection record, traceability and packing documents.
- At site: confirm installation readiness, agreed tests, outstanding items and maintenance handover.

Download the 28-point supplier verification worksheet (CSV) . Record each answer, document reference, reviewer and decision. Treat a blank answer as pending. This is a buyer planning tool; document availability and contractual commitments must be agreed for each order.

Send your requirements and document questions

## Qualification and acceptance reference

For medicinal-product projects, EU GMP Annex 15 sections 3.2–3.7 describe the role of the user requirements specification and factory/site acceptance testing. Applicability and the qualification scope must be determined for the project. European Commission — EU GMP Annex 15 .

Review the manufacturer document sources .

## Related procurement guides

- Pass Box Selection: Static, Dynamic and Transfer Requirements
- HEPA and FFU Procurement: Evidence, Interfaces and Acceptance

## Choose Your Ready-to-Ship Modular Cleanroom Kit (Solutions A to E: 57.1 m² – 86.5 m²)

Don't know how to partition your warehouse into a compliant ISO 14644-1 / GMP / ISO 22716 cleanroom? Our 100-engineer design institute pre-engineered 5 standardized modular cleanroom floor plans (Solutions A, B, C, D, E) . Watch the bilingual 3D walkthrough videos below and click any model to lock in factory-direct container pricing:

### Solution A — 57.1 m² Max-Filling Cleanroom Kit

Maximizes primary production space (41.4 m²) with 3-stage personnel gowning and high-speed roll-up cargo air shower.

### Solution B — 57.1 m² Dual-Zone + Material Holding

Dedicated 13.2 m² Material Holding Room + flush interlocked SUS304 Pass Box for strict packaging segregation.

### Solution C — 61.1 m² Long-Span Conveyor Line Kit

Engineered for automated filling/packaging lines requiring an unobstructed 46.4 m² linear clean hall.

### Solution D — 61.1 m² Full 4-Stage GMP & Dual Airlock

Our highest-spec GMP layout featuring separate 1st & 2nd gowning rooms, material holding room, and cargo shower.

### Solution E — 86.5 m² Panoramic Showpiece Cleanroom

Designed for brand owners needing a high-visibility 10-window VIP viewing facade plus full personnel & cargo airlocks.

### Need a Custom Size or Multi-Floor Smart Factory?

Led by 30+ Year GMP Chief Engineer Mr. Tan Shuping and Chief Architect Mr. Liu Wei , we deliver 9 integrated Design+Build modules across 4 National Bases (Guangzhou HQ, Shanghai, Zhejiang Huzhou Cosmetics Town, Hunan) :

## Verified Government EPC Licenses (RMB 38,000,000 Capital) & 63 National Patents

Unlike trading brokers with zero construction qualifications, our contracting entity Guangdong Hengtai Design Engineering Co., Ltd. (Unified Social Credit Code: 91440101MA59M8NW4E , Legal Rep: Mr. Tan Cheng , Registered Capital: RMB 38,000,000 ) and manufacturing entity Guangzhou Hengtai Purification Technology Co., Ltd. (National High-Tech Cert: GR202444009466 , ISO 9001 Cert: 90924Q00571R0M ) hold full government licenses and 63 National Patents + 19 Software Copyrights . 📥 Download Official Red-Stamp License Dossier (PDF) →

## Guangzhou Hengtai Hytek Group (HENGTAI CLEAN): 5-Pillar Turnkey Ecosystem

Founded in 2012 by Chairman Mr. Tan Cheng and headquartered in Guangzhou (Zhuomei Building South Tower, Huadu District, 15 mins from CAN Airport) with a 26,000 m² smart manufacturing base, Guangzhou Hengtai Hytek Group integrates five specialized engineering & manufacturing companies into one unified contract:

### Guangzhou Hengtai Purification Technology Co., Ltd.

Direct CNC sheet-metal & cleanroom equipment manufacturer: SUS304/316L air showers, dynamic laminar pass boxes, H14 gel-seal FFUs, hygienic AHUs, PSA ozone systems, and HT-II boot washers.

### Hengtai Meiye Architectural Design Institute

Backed by design directors from Tsinghua University Academy of Fine Arts , University of the Arts London (Chelsea) & Guangzhou Academy of Fine Arts . Pioneers of "Marketing Factories" & spiral AR VIP Visiting Corridors .

### Guangdong Hengtai Design Engineering Co., Ltd.

Holds national Grade-II Mechanical & Electrical Installation and Grade-II Building Decoration Contractor licenses. Executes ISO 5–8 cleanrooms, sanitary process piping, and epoxy/AGV flooring.

### Guangdong Guochuang Energy Saving Technology Co., Ltd.

Specializes in heat-recovery cleanroom HVAC, low-dew-point rotor dehumidification (RH <40%), building photovoltaic integration, and smart energy monitoring.

### Guangzhou Hengtai Hytek Group Co., Ltd.

Group holding headquarters & regulatory compliance center. Co-founder of the 2025 Hengtai × Ruikong International AI Intelligent Manufacturing Digital Factory (3-in-1 BIM + Process + AGV Logistics simulation cutting construction time by 30%).

### Walk Inside Our Modular GMP Cleanroom in 720° VR

Inspect flush wall panels, coved corners, double-glazed observation windows, ceiling HEPA diffusers, and epoxy floors interactively in 3D VR.

## Authoritative Leadership & 30+ Year Chief Engineering Directorate

Every turnkey cleanroom blueprint and equipment BOM at HENGTAI CLEAN is personally governed by China's top cosmetics, pharmaceutical, and architectural engineering veterans:

### Mr. Tan Cheng

Entered the cosmetics & health manufacturing sector in 2004, founded Tailenju GMP Consulting in 2012 and Guangzhou Hengtai Purification Technology Co., Ltd. in 2015. Pioneered the integration of ISO/GMP cleanroom engineering with architectural brand aesthetics, scaling group output past RMB 100M within 3 years and 1,500+ benchmark factories.

### Mr. Tan Shuping

30+ years of executive GMP factory planning & cleanroom engineering . Director of the Intelligent Equipment Committee of China Cosmetics IUR Collaborative Innovation Platform; Advisor to Jiangsu Daily Chemical Industry Association; former Director of Suzhou Boke & GM of Shanghai Kemei. Enforces Hengtai's signature standard: "Southern Jiangsu Workmanship, Southern China Service."

### Mr. Liu Wei

Educated at Tsinghua University Academy of Fine Arts and Chelsea College of Arts (University of the Arts London) . Leads our 100-person BIM+ architectural & cleanroom design institute. Directed landmark projects for Shanghai Fosun Pharma, Fuerjia Northern Beauty Valley, Proya, Marubi, Xiaomi HQ, Siemens, and ABB .

## Trusted by 1,000+ Listed Pharma, Cosmetics & Food Giants (Verified Jobsite Records)

From 30-ton/day vacuum emulsifying halls and Class 10,000 sterile suites to spiral AR VIP Visiting Corridors , explore authentic, GPS-watermarked engineering logs from Guangzhou Hengtai:

Panoramic glazed inspection gallery overlooking 304/316L vacuum homogenization & sanitary process piping.

8+ vacuum emulsifying pots (50kg–2000kg) with flush interlocked pass boxes & airtight steel doors.

100% precision delivery from AutoCAD blueprint and BIM twin to actual completed physicochemical lab.

Authentic timestamped construction logs: weighing rooms, emulsifying suites, and high-speed airlocks.

Flush-mounted Magnehelic differential pressure gauges (+15 Pa to +30 Pa) & calibrated thermo-hygrometers.

Orbital TIG-welded hygienic stainless steel utility & purified water transfer manifolds on site.

Chief Engineer Mr. Tan Shuping and our engineering delegation at Booth N4K09.

Grand launching ceremony of our AI-Enhanced Smart Manufacturing Digital Plant in Guangzhou.

## Request a 24-Hour Turnkey Cleanroom & Equipment BOQ

Looking for factory-direct pricing without middleman markups? Send our cleanroom HVAC and stainless equipment engineers your layout, target ISO 14644-1 class, or equipment list.

- Stage-1 Budgetary Quote in 4–24 Hours: Itemized EXW / FOB Guangzhou / CIF / DDP unit pricing & container load plan.
- Free Engineering Value-Add: AutoCAD room pressure cascade review, CFM/ACH air-change calculation & utility matrix.
- Download Technical Dossiers: 6 A4 Engineering Spec Sheets (PDF) →

## Compare quotations on the same scope

Ask each supplier to answer the same requirements and identify the evidence for its proposed configuration. An unanswered field is an open question, not proof that a supplier cannot meet the requirement. Availability and acceptance criteria must be confirmed for your order.

| Comparison field | What to request |
| --- | --- |
| Responsible entities | Seller, manufacturer, designer, installer and acceptance responsibilities |
| Design inputs | Layout, process, utilities, site constraints and approved user requirements |
| Scope and exclusions | Envelope, HVAC, equipment, local construction, freight, tax and interfaces |
| Document revisions | Approved and as-built drawings and change-control responsibilities |
| Schedule dependencies | Design approval, release, shipping, site readiness, installation and testing |
| Acceptance criteria | Operating states, methods, limits, instruments and report approvals |
| Warranty and service | Coverage, response arrangements, parts and local service responsibilities |
| Commercial comparison | Same scope, currency, delivery basis and payment milestones; list unresolved deviations |

Download the 40-field supplier quotation comparison worksheet (CSV)

Review HENGTAI CLEAN factory source documents · Send your requirements and open questions

Updated: 11 September 2026. This worksheet supports procurement review; it does not certify a supplier or replace engineering acceptance.
